High Vibration HM Request
Re: High Vibration HM Request
MT is telling me that the HM request to transfer the MT signal from my SM to my HM is only completed at 52% so looks like I will have to take a 4-hr break and retest around midnight Est.
I just did another HM request exclusively on this MT transfer so it will happen eventually. When? Go figure...
I just know that from now on, all my future HM requests will be ONLY on this MT signal coming from my HM so that we can all get the answers that we crave so much.
I just did another HM request exclusively on this MT transfer so it will happen eventually. When? Go figure...
I just know that from now on, all my future HM requests will be ONLY on this MT signal coming from my HM so that we can all get the answers that we crave so much.
Re: High Vibration HM Request
When we do a HM request in the 4.922 track, it will take on average 4 days to come down into the SM and then our SM will start attracting our goal.
However, with EC, I have the luxury of doing a HM request that will take about 1 hour to clean the TLR but instead of waiting 4 days for this cleanup to come down and clear the SM too, I can then start cleaning right away the SM using EC and once this is done, BOTH the HM/TLR and SM levels will be cleaned and it will then take about 1 hour to take effect in 3D after that.
So from HM request to reality in just about 2 hrs.
I did a HM request to transfer the MT signal from my SM to my HM, but despite all this effort, MT is telling me that it will not work because whether I like it or not, my SM will always be in control of MT because MT has to go through my muscles and it's my SM that's in charge of making them move, so until my SM TOTALLY COOPERATES and clear all it's LBs and patch the cracks around MT and my muscles, I will always have trouble getting a true 100% reliable MT signal coming exclusively from my HM.
So that's when I had the idea of doing a HM request to ask my HM to clear the TLR of EVERYTHING that could use my SM to infiltrate the MT line (ex: through my muscles or other ways) and to clear them. Then when the TLR is cleared, I will start doing the same using EC at the SM level.
This is what I have done 1 hour ago using a HM request and now that the TLR is cleared, I just got the OK to start clearing those same LBs at the SM level instead of waiting 4 days for them to come down and clear the SM. Now it's a matter of waiting for all this cleaning to take effect in 3D and that should take 1 hour (2:30 AM).
I'm not sure if this method will work so that I can clear BOTH the TLR and the SM within 2 hrs or so but it's worth a try. Who wants to wait 4 days here? Not me.
However, with EC, I have the luxury of doing a HM request that will take about 1 hour to clean the TLR but instead of waiting 4 days for this cleanup to come down and clear the SM too, I can then start cleaning right away the SM using EC and once this is done, BOTH the HM/TLR and SM levels will be cleaned and it will then take about 1 hour to take effect in 3D after that.
So from HM request to reality in just about 2 hrs.
I did a HM request to transfer the MT signal from my SM to my HM, but despite all this effort, MT is telling me that it will not work because whether I like it or not, my SM will always be in control of MT because MT has to go through my muscles and it's my SM that's in charge of making them move, so until my SM TOTALLY COOPERATES and clear all it's LBs and patch the cracks around MT and my muscles, I will always have trouble getting a true 100% reliable MT signal coming exclusively from my HM.
So that's when I had the idea of doing a HM request to ask my HM to clear the TLR of EVERYTHING that could use my SM to infiltrate the MT line (ex: through my muscles or other ways) and to clear them. Then when the TLR is cleared, I will start doing the same using EC at the SM level.
This is what I have done 1 hour ago using a HM request and now that the TLR is cleared, I just got the OK to start clearing those same LBs at the SM level instead of waiting 4 days for them to come down and clear the SM. Now it's a matter of waiting for all this cleaning to take effect in 3D and that should take 1 hour (2:30 AM).
I'm not sure if this method will work so that I can clear BOTH the TLR and the SM within 2 hrs or so but it's worth a try. Who wants to wait 4 days here? Not me.
- VirgoShowgirl
- Moderator
- Posts: 4051
- Joined: Fri Jul 05, 2013 4:53 am
- Location: Brussels, BE
Re: High Vibration HM Request
Haha I bet you don’t want to wait !
Re: High Vibration HM Request
VirgoShowgirl wrote:Haha I bet you don’t want to wait !
Haha and I bet you don't want either?
We will all know in about 2 minutes if all this cleanup my HM did at the TLR and I did at the SM will really take effect in 3D about 2 hrs after I did the HM request. That could be a revolution in itself if it works.
Re: High Vibration HM Request
It looks like it failed because I programmed the HM request only to remove the LBs influencing my MT signal but I forgotten to tell my HM to plant the right PBs to give MT the specific next winning number.
Typical rookie mistake...
I was telling my friend Lyne that a HM request is like a NAP. Let's say that you are standing on a street corner and you want to cross the street to go to the other street corner but you have a ball and chain attached to your foot.
The 1st thing you need to do is a Cleaning NAP to remove the ball and chain (LBs) but will removing the ball take you to the other side of the street? Of course not. You still have to cross the street to get there and that is done with a Goal NAP by implanting PBs.
Well in my HM request I did that same mistake. requesting my HM to remove LBs but didn't ask to plant PBs so that's what I'll do now.
Typical rookie mistake...
I was telling my friend Lyne that a HM request is like a NAP. Let's say that you are standing on a street corner and you want to cross the street to go to the other street corner but you have a ball and chain attached to your foot.
The 1st thing you need to do is a Cleaning NAP to remove the ball and chain (LBs) but will removing the ball take you to the other side of the street? Of course not. You still have to cross the street to get there and that is done with a Goal NAP by implanting PBs.
Well in my HM request I did that same mistake. requesting my HM to remove LBs but didn't ask to plant PBs so that's what I'll do now.
- VirgoShowgirl
- Moderator
- Posts: 4051
- Joined: Fri Jul 05, 2013 4:53 am
- Location: Brussels, BE
Re: High Vibration HM Request
How long for that to take effect ?
Re: High Vibration HM Request
I need to do a 2nd HM request in 30 minutes and then it should take effect in 3D 10 minutes after so around 4 AM Est.VirgoShowgirl wrote:How long for that to take effect ?
Re: High Vibration HM Request
Dear HM, please shift me into a reality where Merlin didnt do this rookie bookie mistake so that I learn how to shift into other realities.
Re: High Vibration HM Request
Hey as long as it works, I'll do all the mistakes that I can do.
Re: High Vibration HM Request
Well it looks like I'm still missing a piece of the puzzle.
I'll test again tomorrow.
I'll test again tomorrow.